How long does it take to build a thorium reactor?

584 21a b69 103 998 64a 163 6a8 61f 81d 03b e49 dc2 436 a26 8b4 066 585 210 0fe 266 e54 4b7 cf2 b6e e06 969 cdb 0dd 6cd dc0 0d6 6fb 03e 387 e7f 5f1 42f 52b 136 c23 66d 507 34e 613 e90 ced 0e1 9e3 595 acd fd6 0fb 0e8 966 b19 57e 3ef a96 4b0 7a2 5be a07 47c 2f6 642 0eb 55b e5e 77f 930 7d2 e1c 87f af1 1fb dfd a74 1a3 232 ad5 f63 494 c24 440 a65 575 9ec 239 5f7 f46 98e a8e cbe abc 79c ffb a58 c96 5fe


Estimates to complete a reactor were originally set at ten years in 2006 (with a proposed operational date of 2015). On the research potential of thorium-based nuclear power, Richard L.

Why don’t we build thorium reactors?

Although in many ways thorium would be a better radioactive element to use for nuclear power, it's also more difficult to weaponise than uranium. Uranium and plutonium have long been at the heart of nuclear power, but many experts see thorium as a better option.

How long does it take to build a reactor?

Nuclear power plants are more complex than other large-scale power generation plants, and so are more capital-intensive and may take longer to construct. Typically a nuclear power plant will take over five years to construct whereas natural gas-fired plants are frequently built in about two years.

What is wrong with thorium reactors?

Irradiated Thorium is more dangerously radioactive in the short term. The Th-U cycle invariably produces some U-232, which decays to Tl-208, which has a 2.6 MeV gamma ray decay mode. Bi-212 also causes problems. These gamma rays are very hard to shield, requiring more expensive spent fuel handling and/or reprocessing.

How much does it cost to build a thorium reactor?

The capital costs of thorium reactors would be lower than conventional nuclear reactors; a 1 gigawatt (GW) thorium power plant would cost at most an estimated $780 million in comparison to capital costs currently of $1.1 billion per GW for a uranium-fueled reactor.

Is anyone building a thorium reactor?

At least one of the 2MW thorium prototypes, either a molten salt reactor, or a molten salt-cooled reactor, is nearing completion, with startup in September 2021.

Will thorium reactors work?

Thorium cannot in itself power a reactor; unlike natural uranium, it does not contain enough fissile material to initiate a nuclear chain reaction. As a result it must first be bombarded with neutrons to produce the highly radioactive isotope uranium-233 – 'so these are really U-233 reactors,' says Karamoskos.

How long does it take to construct a nuke?

Global nuclear reactor construction time 1981-2020 Median construction time required for nuclear reactors worldwide oscillated from around 83 months to 84 months, from 1981 to 2020 respectively.

How many years does it take to build a power plant?

Construction and Running (See Fig. 2). According to the Nuclear Energy Agency (NEA), it takes about five to seven years to build a large nuclear unit. Once the nuclear power plant is built, it is tested by the electric company to see if it properly runs, and if the power plant passes that test, it is ready to be used.

Will we run out of thorium?

This means that even in our extreme scenario, the combined uranium and thorium of the United States would be enough to power the world for about 100.000 years.